Prefab Floor Deck Laid on a Steel Base Frame
A large floor deck of boards laid over a red steel base frame on a prefab building site, with the team working across it.
What You See in This Video
- Floor boards laid over a red steel base frame
- Team working across the floor deck
- Steel framing ready along the edges
About This Work
This video was recorded on a Bab Al Qasar Prefab House project and shows work by our team. We design, build and install porta cabins, prefab buildings and containers from our factory in Sajaa Industrial Area, Sharjah, and deliver across all 7 emirates.
Related: Prefabricated Buildings, our projects and how cabins are installed.
See all project videosGet a free quotation. Call +971 52 475 5394, message us on WhatsApp or send your requirements. Our factory is at Sajaa Industrial Area, Al Sajaa, Sharjah, open Mon–Sat 8 AM–6 PM, Sun 8 AM–9 PM.
4.8/5 on Google from 6 reviews. Read our Google reviews · Leave a review
