Two-Storey Prefab Building Under Construction
A two-storey prefab building under construction, with a crane and scaffolding outside, then inside to the red steel frame, purlins and open floor.
What You See in This Video
- Crane and scaffolding beside the two-storey building
- Lifting-in-progress safety sign on site
- Red steel beams and purlins inside
- Wide open floor before partitions
About This Work
This video was recorded on a Bab Al Qasar Prefab House project and shows work by our team. We design, build and install porta cabins, prefab buildings and containers from our factory in Sajaa Industrial Area, Sharjah, and deliver across all 7 emirates.
Related: Double Storey Porta Cabins, our projects and how cabins are installed.
See all project videosGet a free quotation. Call +971 52 475 5394, message us on WhatsApp or send your requirements. Our factory is at Sajaa Industrial Area, Al Sajaa, Sharjah, open Mon–Sat 8 AM–6 PM, Sun 8 AM–9 PM.
4.8/5 on Google from 6 reviews. Read our Google reviews · Leave a review
